I.R. 680 over Ramp E over Dewey Ave

Good

Mahoning County, Ohio · 1.33 MI N of SR 625 · Structure no. 5007348

Built
1973
52 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
253 ft
3 main spans
Daily traffic
5,000
2013 count
Owner
State
State Highway Agency

About this bridge

I.R. 680 over Ramp E over Dewey Ave is a steel continuous stringer/multi-beam or girder carrying I.R. 680 over Ramp E over Dewey Ave in Mahoning County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, projected to reach 6,940 by 2033. The structure is 253 ft (77.1 m) long and 38 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI.R. 680
CrossesRamp E over Dewey Ave
Location1.33 MI N of SR 625
RouteInterstate 680
StateOhio
Coordinates41.07769, -80.6315
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating44 US tons
Inventory rating34 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length253 ft (77.1 m)
Longest span96 ft (29.3 m)
Deck width38 ft (11.6 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2013)
Projected traffic6,940 by 2033
Trucks—
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I.R. 680 over Ramp E over Dewey Ave built?

It was built in 1973, making it 52 years old in 2025.

What condition is I.R. 680 over Ramp E over Dewey Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does I.R. 680 over Ramp E over Dewey Ave carry?

About 5,000 vehicles per day (2013 count).

How long is I.R. 680 over Ramp E over Dewey Ave?

The structure is 253 ft (77.1 m) long with a longest span of 96 ft (29.3 m) and a deck 38 ft wide.

Who owns I.R. 680 over Ramp E over Dewey Ave?

It is owned by the State Highway Agency.