US Bridges

New Road CR 162 over SR 11

Good

Mahoning County, Ohio · 2.91 MI N of US 62 · Structure no. 5000661

Built
1970
55 years old, rebuilt 2008
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
291 ft
4 main spans
Daily traffic
6,123
2015 count
Owner
State
State Highway Agency

About this bridge

New Road CR 162 over SR 11 is a steel continuous stringer/multi-beam or girder carrying New Road CR 162 over SR 11 in Mahoning County, Ohio. It was built in 1970 and reconstructed in 2008, so it is 55 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,123 vehicles a day, roughly 5% of them trucks, projected to reach 48,320 by 2035. The structure is 291 ft (88.6 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesNew Road CR 162
CrossesSR 11
Location2.91 MI N of US 62
RouteCounty Highway C0162
StateOhio
Coordinates41.08369, -80.75177
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 25 or greater
Structure length291 ft (88.6 m)
Longest span84 ft (25.6 m)
Deck width42 ft (12.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,123 (2015)
Projected traffic48,320 by 2035
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was New Road CR 162 over SR 11 built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2008.

What condition is New Road CR 162 over SR 11 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does New Road CR 162 over SR 11 carry?

About 6,123 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is New Road CR 162 over SR 11?

The structure is 291 ft (88.6 m) long with a longest span of 84 ft (25.6 m) and a deck 42 ft wide.

Who owns New Road CR 162 over SR 11?

It is owned by the State Highway Agency.