US Bridges

Toland Street over Oak Run

Good

Madison County, Ohio · 0.07 M S of South St. · Structure no. 4960727

Built
2015
10 years old
Condition
Good
inspected October 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
77 ft
1 main span
Daily traffic
920
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Toland Street over Oak Run is a prestressed concrete box beam or girders - multiple carrying Toland Street over Oak Run in Madison County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 920 vehicles a day, roughly 5% of them trucks, projected to reach 960 by 2042. The structure is 77 ft (23.5 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesToland Street
CrossesOak Run
Location0.07 M S of South St.
RouteCity Street TOLAN
StateOhio
Coordinates39.87918, -83.44628
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length77 ft (23.5 m)
Longest span75 ft (22.9 m)
Deck width36 ft (11 m)
Roadway width25 ft (7.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic920 (2022)
Projected traffic960 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Toland Street over Oak Run built?

It was built in 2015, making it 10 years old in 2025.

What condition is Toland Street over Oak Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Toland Street over Oak Run carry?

About 920 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Toland Street over Oak Run?

The structure is 77 ft (23.5 m) long with a longest span of 75 ft (22.9 m) and a deck 36 ft wide.

Who owns Toland Street over Oak Run?

It is owned by the City or Municipal Highway Agency.