SR665 over Morehead Run
GoodMadison County, Ohio · 01.00 MI E.Of CR70 · Structure no. 4904397
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 36 ft
- 1 main span
- Daily traffic
- 1,340
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR665 over Morehead Run is a prestressed concrete box beam or girders - multiple carrying SR665 over Morehead Run in Madison County, Ohio. It was built in 1996, so it is 29 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,340 vehicles a day, roughly 5% of them trucks, projected to reach 1,860 by 2035. The structure is 36 ft (11.1 m) long and 32 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR665 over Morehead Run built?
It was built in 1996, making it 29 years old in 2025.
What condition is SR665 over Morehead Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does SR665 over Morehead Run carry?
About 1,340 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is SR665 over Morehead Run?
The structure is 36 ft (11.1 m) long with a longest span of 35 ft (10.7 m) and a deck 32 ft wide.
Who owns SR665 over Morehead Run?
It is owned by the State Highway Agency.