Miami Street CO557 over Norfolk Southern
GoodLucas County, Ohio · 0.27 MI S of SR2 · Structure no. 4861109
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 140 ft
- 2 main spans
- Daily traffic
- 10,873
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Miami Street CO557 over Norfolk Southern is a prestressed concrete box beam or girders - multiple carrying Miami Street CO557 over Norfolk Southern in Lucas County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,873 vehicles a day, roughly 3% of them trucks, projected to reach 15,092 by 2036. The structure is 140 ft (42.7 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Miami Street CO557 over Norfolk Southern built?
It was built in 2017, making it 8 years old in 2025.
What condition is Miami Street CO557 over Norfolk Southern in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Miami Street CO557 over Norfolk Southern carry?
About 10,873 vehicles per day (2016 count), of which roughly 3% are trucks.
How long is Miami Street CO557 over Norfolk Southern?
The structure is 140 ft (42.7 m) long with a longest span of 86 ft (26.2 m) and a deck 50 ft wide.
Who owns Miami Street CO557 over Norfolk Southern?
It is owned by the City or Municipal Highway Agency.