Eber Road over Drennan Ditch 3083
GoodLucas County, Ohio · 0.16 M. S. of Frankfort · Structure no. 4831519
- Built
- 1963
- 62 years old, rebuilt 1992
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 84
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Eber Road over Drennan Ditch 3083 is a prestressed concrete box beam or girders - multiple carrying Eber Road over Drennan Ditch 3083 in Lucas County, Ohio. It was built in 1963 and reconstructed in 1992, so it is 62 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 84 vehicles a day, roughly 8% of them trucks, projected to reach 117 by 2035. The structure is 27 ft (8.2 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Eber Road over Drennan Ditch 3083 built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1992.
What condition is Eber Road over Drennan Ditch 3083 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Eber Road over Drennan Ditch 3083 carry?
About 84 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is Eber Road over Drennan Ditch 3083?
The structure is 27 ft (8.2 m) long with a longest span of 26 ft (7.9 m) and a deck 29 ft wide.
Who owns Eber Road over Drennan Ditch 3083?
It is owned by the County Highway Agency.