Fulton-Lucas RD over Ten Mile Creek 0001
GoodLucas County, Ohio · 0.1 Mi. N. of Syl-Met RD · Structure no. 4830741
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 455
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Fulton-Lucas RD over Ten Mile Creek 0001 is a prestressed concrete box beam or girders - multiple carrying Fulton-Lucas RD over Ten Mile Creek 0001 in Lucas County, Ohio. It was built in 2015, so it is 10 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 455 vehicles a day, roughly 1% of them trucks, projected to reach 555 by 2035. The structure is 62 ft (18.9 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fulton-Lucas RD over Ten Mile Creek 0001 built?
It was built in 2015, making it 10 years old in 2025.
What condition is Fulton-Lucas RD over Ten Mile Creek 0001 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Fulton-Lucas RD over Ten Mile Creek 0001 carry?
About 455 vehicles per day (2015 count), of which roughly 1% are trucks.
How long is Fulton-Lucas RD over Ten Mile Creek 0001?
The structure is 62 ft (18.9 m) long with a longest span of 62 ft (18.9 m) and a deck 30 ft wide.
Who owns Fulton-Lucas RD over Ten Mile Creek 0001?
It is owned by the County Highway Agency.