About this bridge
Corey Rd. over Ir 475 is a steel continuous stringer/multi-beam or girder carrying Corey Rd. over Ir 475 in Lucas County, Ohio. It was built in 1969, so it is 56 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 14,673 vehicles a day, roughly 2% of them trucks, projected to reach 16,500 by 2039. The structure is 197 ft (60 m) long and 38 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Corey Rd. over Ir 475 built?
It was built in 1969, making it 56 years old in 2025.
What condition is Corey Rd. over Ir 475 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in January 2025.
How much traffic does Corey Rd. over Ir 475 carry?
About 14,673 vehicles per day (2019 count), of which roughly 2% are trucks.
How long is Corey Rd. over Ir 475?
The structure is 197 ft (60 m) long with a longest span of 57 ft (17.4 m) and a deck 38 ft wide.
Who owns Corey Rd. over Ir 475?
It is owned by the State Highway Agency.