US Bridges

Ir 280 NB over Summit to Champlain NSRR

Fair

Lucas County, Ohio · N.Nb.Appr.Span to Vgcs. · Structure no. 4806107

Built
2007
18 years old
Condition
Fair
inspected September 2024
Type
Box Beam or Girders - Single or Spread
Prestressed Concrete Continuous
Length
3,916 ft
29 main spans
Daily traffic
28,964
2015 count
Owner
State
State Highway Agency

About this bridge

Ir 280 NB over Summit to Champlain NSRR is a prestressed concrete continuous box beam or girders - single or spread carrying Ir 280 NB over Summit to Champlain NSRR in Lucas County, Ohio. It was built in 2007, so it is 18 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,964 vehicles a day, roughly 16% of them trucks, projected to reach 40,202 by 2035. The structure is 3,916 ft (1,193.6 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 280 NB
CrossesSummit to Champlain NSRR
LocationN.Nb.Appr.Span to Vgcs.
RouteInterstate 280
StateOhio
Coordinates41.66273, -83.51282
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating85.8 US tons
Inventory rating46.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans29
Design loadHS 25 or greater
Structure length3,916 ft (1,193.6 m)
Longest span151 ft (46 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deck29 ft (8.7 m)

Traffic and service

Average daily traffic28,964 (2015)
Projected traffic40,202 by 2035
Trucks16%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 280 NB over Summit to Champlain NSRR built?

It was built in 2007, making it 18 years old in 2025.

What condition is Ir 280 NB over Summit to Champlain NSRR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Ir 280 NB over Summit to Champlain NSRR carry?

About 28,964 vehicles per day (2015 count), of which roughly 16% are trucks.

How long is Ir 280 NB over Summit to Champlain NSRR?

The structure is 3,916 ft (1,193.6 m) long with a longest span of 151 ft (46 m) and a deck 59 ft wide.

Who owns Ir 280 NB over Summit to Champlain NSRR?

It is owned by the State Highway Agency.