US Bridges

Ir 75 Ramp over SR 25 SB SR 25 Ramp a

Good

Lucas County, Ohio · Jct. SR 25 · Structure no. 4804806

Built
2022
3 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
270 ft
2 main spans
Daily traffic
8,280
2018 count
Owner
State
State Highway Agency

About this bridge

Ir 75 Ramp over SR 25 SB SR 25 Ramp a is a steel continuous stringer/multi-beam or girder carrying Ir 75 Ramp over SR 25 SB SR 25 Ramp a in Lucas County, Ohio. It was built in 2022, so it is 3 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,280 vehicles a day, roughly 6% of them trucks, projected to reach 7,240 by 2038. The structure is 270 ft (82.2 m) long and 29 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIr 75 Ramp
CrossesSR 25 SB SR 25 Ramp a
LocationJct. SR 25
RouteInterstate 75
StateOhio
Coordinates41.64555, -83.54841
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.5 US tons
Inventory rating56.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length270 ft (82.2 m)
Longest span151 ft (46.1 m)
Deck width29 ft (8.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck22 ft (6.8 m)

Traffic and service

Average daily traffic8,280 (2018)
Projected traffic7,240 by 2038
Trucks6%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 Ramp over SR 25 SB SR 25 Ramp a built?

It was built in 2022, making it 3 years old in 2025.

What condition is Ir 75 Ramp over SR 25 SB SR 25 Ramp a in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Ir 75 Ramp over SR 25 SB SR 25 Ramp a carry?

About 8,280 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is Ir 75 Ramp over SR 25 SB SR 25 Ramp a?

The structure is 270 ft (82.2 m) long with a longest span of 151 ft (46.1 m) and a deck 29 ft wide.

Who owns Ir 75 Ramp over SR 25 SB SR 25 Ramp a?

It is owned by the State Highway Agency.