US Bridges

SR 25 over Collingwood Blvd

Good

Lucas County, Ohio · WB SR 25 over Collingwood · Structure no. 4801563

Built
1963
62 years old, rebuilt 2010
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
190 ft
3 main spans
Daily traffic
15,894
2015 count
Owner
State
State Highway Agency

About this bridge

SR 25 over Collingwood Blvd is a steel continuous stringer/multi-beam or girder carrying SR 25 over Collingwood Blvd in Lucas County, Ohio. It was built in 1963 and reconstructed in 2010, so it is 62 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,894 vehicles a day, roughly 4% of them trucks, projected to reach 22,061 by 2035. The structure is 190 ft (57.9 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR 25
CrossesCollingwood Blvd
LocationWB SR 25 over Collingwood
RouteState Highway 25
StateOhio
Coordinates41.64188, -83.55158
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating40.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length190 ft (57.9 m)
Longest span77 ft (23.5 m)
Deck width36 ft (11.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,894 (2015)
Projected traffic22,061 by 2035
Trucks4%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 25 over Collingwood Blvd built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 2010.

What condition is SR 25 over Collingwood Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SR 25 over Collingwood Blvd carry?

About 15,894 vehicles per day (2015 count), of which roughly 4% are trucks.

How long is SR 25 over Collingwood Blvd?

The structure is 190 ft (57.9 m) long with a longest span of 77 ft (23.5 m) and a deck 36 ft wide.

Who owns SR 25 over Collingwood Blvd?

It is owned by the State Highway Agency.