SR 2 - Western Ave over Swan Creek
GoodLucas County, Ohio · 100 Ft West of Spencer ST · Structure no. 4800222
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 114 ft
- 1 main span
- Daily traffic
- 11,386
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
SR 2 - Western Ave over Swan Creek is a steel stringer/multi-beam or girder carrying SR 2 - Western Ave over Swan Creek in Lucas County, Ohio. It was built in 1995, so it is 30 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,386 vehicles a day, roughly 4% of them trucks, projected to reach 14,671 by 2039. The structure is 114 ft (34.7 m) long and 52 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 2 - Western Ave over Swan Creek built?
It was built in 1995, making it 30 years old in 2025.
What condition is SR 2 - Western Ave over Swan Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR 2 - Western Ave over Swan Creek carry?
About 11,386 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is SR 2 - Western Ave over Swan Creek?
The structure is 114 ft (34.7 m) long with a longest span of 112 ft (34.1 m) and a deck 52 ft wide.
Who owns SR 2 - Western Ave over Swan Creek?
It is owned by the State Highway Agency.