US Bridges

Recreation Lane over French Creek

Good

Lorain County, Ohio · 0.2 MI from SR 611 JCT · Structure no. 4765427

Built
2011
14 years old
Condition
Good
inspected September 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
121 ft
1 main span
Daily traffic
100
2008 count
Owner
City
City or Municipal Highway Agency

About this bridge

Recreation Lane over French Creek is a prestressed concrete box beam or girders - multiple carrying Recreation Lane over French Creek in Lorain County, Ohio. It was built in 2011, so it is 14 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 139 by 2028. The structure is 121 ft (36.9 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRecreation Lane
CrossesFrench Creek
Location0.2 MI from SR 611 JCT
RouteCity Street RECRE
StateOhio
Coordinates41.46214, -82.05887
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97.6 US tons
Inventory rating59.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length121 ft (36.9 m)
Longest span118 ft (36 m)
Deck width40 ft (12.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2008)
Projected traffic139 by 2028
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Recreation Lane over French Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Recreation Lane over French Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Recreation Lane over French Creek carry?

About 100 vehicles per day (2008 count), of which roughly 10% are trucks.

How long is Recreation Lane over French Creek?

The structure is 121 ft (36.9 m) long with a longest span of 118 ft (36 m) and a deck 40 ft wide.

Who owns Recreation Lane over French Creek?

It is owned by the City or Municipal Highway Agency.