US Bridges

Folley RD over Plum Creek

Good

Lorain County, Ohio · .07 Miles East of Station · Structure no. 4735121

Built
2017
8 years old
Condition
Good
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
44 ft
1 main span
Daily traffic
600
1996 count
Owner
County
County Highway Agency

About this bridge

Folley RD over Plum Creek is a prestressed concrete box beam or girders - multiple carrying Folley RD over Plum Creek in Lorain County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 600 vehicles a day, roughly 1% of them trucks, projected to reach 702 by 2016. The structure is 44 ft (13.4 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFolley RD
CrossesPlum Creek
Location.07 Miles East of Station
RouteCounty Highway T0137
StateOhio
Coordinates41.32056, -81.94243
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment9: Superior to present desirable criteria
Operating rating82.1 US tons
Inventory rating63.2 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length44 ft (13.4 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic600 (1996)
Projected traffic702 by 2016
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Folley RD over Plum Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is Folley RD over Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Folley RD over Plum Creek carry?

About 600 vehicles per day (1996 count), of which roughly 1% are trucks.

How long is Folley RD over Plum Creek?

The structure is 44 ft (13.4 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns Folley RD over Plum Creek?

It is owned by the County Highway Agency.