US Bridges

SR-292 over Mill Creek

Good

Logan County, Ohio · .43 Mi.S. Jct. SR-47 · Structure no. 4603192

Built
2007
18 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
83 ft
1 main span
Daily traffic
1,050
2015 count
Owner
State
State Highway Agency

About this bridge

SR-292 over Mill Creek is a prestressed concrete box beam or girders - multiple carrying SR-292 over Mill Creek in Logan County, Ohio. It was built in 2007, so it is 18 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,050 vehicles a day, roughly 6% of them trucks, projected to reach 1,457 by 2035. The structure is 83 ft (25.2 m) long and 36 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesSR-292
CrossesMill Creek
Location.43 Mi.S. Jct. SR-47
RouteState Highway 292
StateOhio
Coordinates40.40365, -83.60337
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.8 US tons
Inventory rating48.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 25 or greater
Structure length83 ft (25.2 m)
Longest span80 ft (24.5 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,050 (2015)
Projected traffic1,457 by 2035
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-292 over Mill Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is SR-292 over Mill Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR-292 over Mill Creek carry?

About 1,050 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is SR-292 over Mill Creek?

The structure is 83 ft (25.2 m) long with a longest span of 80 ft (24.5 m) and a deck 36 ft wide.

Who owns SR-292 over Mill Creek?

It is owned by the State Highway Agency.