US Bridges

SR 235 over Indian Creek

Good

Logan County, Ohio · 1.34M N.Of SR47 · Structure no. 4602021

Built
1990
35 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
59 ft
1 main span
Daily traffic
2,085
2015 count
Owner
State
State Highway Agency

About this bridge

SR 235 over Indian Creek is a prestressed concrete box beam or girders - multiple carrying SR 235 over Indian Creek in Logan County, Ohio. It was built in 1990, so it is 35 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,085 vehicles a day, roughly 8% of them trucks, projected to reach 2,894 by 2035. The structure is 59 ft (18 m) long and 44 ft wide. If it were closed, the detour would be 14.9 mi (24 km).

CarriesSR 235
CrossesIndian Creek
Location1.34M N.Of SR47
RouteState Highway 235
StateOhio
Coordinates40.37065, -83.90725
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.5 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length59 ft (18 m)
Longest span55 ft (16.8 m)
Deck width44 ft (13.4 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,085 (2015)
Projected traffic2,894 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 235 over Indian Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is SR 235 over Indian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR 235 over Indian Creek carry?

About 2,085 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SR 235 over Indian Creek?

The structure is 59 ft (18 m) long with a longest span of 55 ft (16.8 m) and a deck 44 ft wide.

Who owns SR 235 over Indian Creek?

It is owned by the State Highway Agency.