US Bridges

Summit Street over Quarry Run

Good

Licking County, Ohio · Summit ST over Quarry Run · Structure no. 4560973

Built
1991
34 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
24 ft
1 main span
Daily traffic
100
1991 count
Owner
City
City or Municipal Highway Agency

About this bridge

Summit Street over Quarry Run is a concrete culvert carrying Summit Street over Quarry Run in Licking County, Ohio. It was built in 1991, so it is 34 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 139 by 2011. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 5 mi (8 km).

CarriesSummit Street
CrossesQuarry Run
LocationSummit ST over Quarry Run
RouteCity Street 299
StateOhio
Coordinates40.04837, -82.38869
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating55.3 US tons
Inventory rating36.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span22 ft (6.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (1991)
Projected traffic139 by 2011
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Summit Street over Quarry Run built?

It was built in 1991, making it 34 years old in 2025.

What condition is Summit Street over Quarry Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Summit Street over Quarry Run carry?

About 100 vehicles per day (1991 count), of which roughly 10% are trucks.

How long is Summit Street over Quarry Run?

The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.8 m).

Who owns Summit Street over Quarry Run?

It is owned by the City or Municipal Highway Agency.