US Bridges

Pinewood Trail RD over Priest Run

Good

Licking County, Ohio · 870 Ft W of SR 586 · Structure no. 4537386

Built
1997
28 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
30 ft
1 main span
Daily traffic
124
2015 count
Owner
County
County Highway Agency

About this bridge

Pinewood Trail RD over Priest Run is a steel stringer/multi-beam or girder carrying Pinewood Trail RD over Priest Run in Licking County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 124 vehicles a day, roughly 7% of them trucks, projected to reach 172 by 2035. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesPinewood Trail RD
CrossesPriest Run
Location870 Ft W of SR 586
RouteCounty Highway C0202
StateOhio
Coordinates40.15286, -82.22133
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating71.4 US tons
Inventory rating50 US tons

Structure

MaterialSteel
DeckCorrugated steel
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span29 ft (8.7 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic124 (2015)
Projected traffic172 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pinewood Trail RD over Priest Run built?

It was built in 1997, making it 28 years old in 2025.

What condition is Pinewood Trail RD over Priest Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Pinewood Trail RD over Priest Run carry?

About 124 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Pinewood Trail RD over Priest Run?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.7 m) and a deck 24 ft wide.

Who owns Pinewood Trail RD over Priest Run?

It is owned by the County Highway Agency.