Slate Run Road over Indian Guyan Creek
FairLawrence County, Ohio · .20 MI W of ST Route 775 · Structure no. 4441753
- Built
- 1900
- 125 years old
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete Continuous
- Length
- 129 ft
- 3 main spans
- Daily traffic
- 390
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Slate Run Road over Indian Guyan Creek is a concrete continuous slab carrying Slate Run Road over Indian Guyan Creek in Lawrence County, Ohio. It was built in 1900, so it is 125 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 390 vehicles a day, roughly 7% of them trucks, projected to reach 541 by 2035. The structure is 129 ft (39.3 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Slate Run Road over Indian Guyan Creek built?
It was built in 1900, making it 125 years old in 2025.
What condition is Slate Run Road over Indian Guyan Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Slate Run Road over Indian Guyan Creek carry?
About 390 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Slate Run Road over Indian Guyan Creek?
The structure is 129 ft (39.3 m) long with a longest span of 48 ft (14.6 m) and a deck 28 ft wide.
Who owns Slate Run Road over Indian Guyan Creek?
It is owned by the County Highway Agency.