US Bridges

SR141 over Long Creek

Good

Lawrence County, Ohio · 0.18 M W of SR775 · Structure no. 4402589

Built
2017
8 years old
Condition
Good
inspected July 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
1,600
2017 count
Owner
State
State Highway Agency

About this bridge

SR141 over Long Creek is a prestressed concrete box beam or girders - multiple carrying SR141 over Long Creek in Lawrence County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,600 vehicles a day, projected to reach 1,600 by 2037. The structure is 50 ft (15.2 m) long and 32 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSR141
CrossesLong Creek
Location0.18 M W of SR775
RouteState Highway 141
StateOhio
Coordinates38.62796, -82.46059
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating85.8 US tons
Inventory rating53.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,600 (2017)
Projected traffic1,600 by 2037
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR141 over Long Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR141 over Long Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does SR141 over Long Creek carry?

About 1,600 vehicles per day (2017 count).

How long is SR141 over Long Creek?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 32 ft wide.

Who owns SR141 over Long Creek?

It is owned by the State Highway Agency.