US Bridges

SR 608 over Greenway Corridor

Good

Lake County, Ohio · 1.5 MI E of SR44 · Structure no. 4306318

Built
2017
8 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
33 ft
1 main span
Daily traffic
2,700
2017 count
Owner
State
State Highway Agency

About this bridge

SR 608 over Greenway Corridor is a concrete culvert carrying SR 608 over Greenway Corridor in Lake County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,700 vehicles a day, roughly 5% of them trucks, projected to reach 2,700 by 2037. The structure is 33 ft (10.2 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSR 608
CrossesGreenway Corridor
Location1.5 MI E of SR44
RouteState Highway 608
StateOhio
Coordinates41.67347, -81.22045
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating57.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHL 93
Structure length33 ft (10.2 m)
Longest span21 ft (6.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,700 (2017)
Projected traffic2,700 by 2037
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$2,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 608 over Greenway Corridor built?

It was built in 2017, making it 8 years old in 2025.

What condition is SR 608 over Greenway Corridor in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR 608 over Greenway Corridor carry?

About 2,700 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is SR 608 over Greenway Corridor?

The structure is 33 ft (10.2 m) long with a longest span of 21 ft (6.4 m).

Who owns SR 608 over Greenway Corridor?

It is owned by the State Highway Agency.