SR 283 over Chagrin R. 3.84 MI W 306
FairLake County, Ohio · Approx 1MI E SR91 · Structure no. 4305671
- Built
- 1932
- 93 years old, rebuilt 1970
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 288 ft
- 4 main spans
- Daily traffic
- 13,813
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 283 over Chagrin R. 3.84 MI W 306 is a steel stringer/multi-beam or girder carrying SR 283 over Chagrin R. 3.84 MI W 306 in Lake County, Ohio. It was built in 1932 and reconstructed in 1970, so it is 93 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,813 vehicles a day, roughly 6% of them trucks, projected to reach 19,172 by 2035. The structure is 288 ft (87.8 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 283 over Chagrin R. 3.84 MI W 306 built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1970.
What condition is SR 283 over Chagrin R. 3.84 MI W 306 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 283 over Chagrin R. 3.84 MI W 306 carry?
About 13,813 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is SR 283 over Chagrin R. 3.84 MI W 306?
The structure is 288 ft (87.8 m) long with a longest span of 101 ft (30.8 m) and a deck 40 ft wide.
Who owns SR 283 over Chagrin R. 3.84 MI W 306?
It is owned by the State Highway Agency.