SR 528 over I-90 (LAK-90-2687)
FairLake County, Ohio · 1.5 MI E Grand River · Structure no. 4305019
- Built
- 1960
- 65 years old, rebuilt 1999
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 300 ft
- 4 main spans
- Daily traffic
- 7,030
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 528 over I-90 (LAK-90-2687) is a steel continuous stringer/multi-beam or girder carrying SR 528 over I-90 (LAK-90-2687) in Lake County, Ohio. It was built in 1960 and reconstructed in 1999, so it is 65 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,030 vehicles a day, roughly 6% of them trucks, projected to reach 9,758 by 2035. The structure is 300 ft (91.4 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 528 over I-90 (LAK-90-2687) built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1999.
What condition is SR 528 over I-90 (LAK-90-2687) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does SR 528 over I-90 (LAK-90-2687) carry?
About 7,030 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is SR 528 over I-90 (LAK-90-2687)?
The structure is 300 ft (91.4 m) long with a longest span of 90 ft (27.4 m) and a deck 47 ft wide.
Who owns SR 528 over I-90 (LAK-90-2687)?
It is owned by the State Highway Agency.