US Bridges

SR 615 over I-90 (center SR-615)

Good

Lake County, Ohio · 3.2 MI E SR306 · Structure no. 4304055

Built
2001
24 years old, rebuilt 2004
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
391 ft
6 main spans
Daily traffic
17,402
2015 count
Owner
State
State Highway Agency

About this bridge

SR 615 over I-90 (center SR-615) is a steel continuous stringer/multi-beam or girder carrying SR 615 over I-90 (center SR-615) in Lake County, Ohio. It was built in 2001 and reconstructed in 2004, so it is 24 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,402 vehicles a day, roughly 7% of them trucks, projected to reach 24,154 by 2035. The structure is 391 ft (119.2 m) long and 54 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 615
CrossesI-90 (center SR-615)
Location3.2 MI E SR306
RouteState Highway 615
StateOhio
Coordinates41.64615, -81.3403
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.2 US tons
Inventory rating56.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length391 ft (119.2 m)
Longest span72 ft (21.9 m)
Deck width54 ft (16.5 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,402 (2015)
Projected traffic24,154 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 615 over I-90 (center SR-615) built?

It was built in 2001, making it 24 years old in 2025. It was reconstructed in 2004.

What condition is SR 615 over I-90 (center SR-615) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR 615 over I-90 (center SR-615) carry?

About 17,402 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is SR 615 over I-90 (center SR-615)?

The structure is 391 ft (119.2 m) long with a longest span of 72 ft (21.9 m) and a deck 54 ft wide.

Who owns SR 615 over I-90 (center SR-615)?

It is owned by the State Highway Agency.