US Bridges

SR 86 over Kellogg Creek

Good

Lake County, Ohio · .63 MI S SR 84 · Structure no. 4303148

Built
2008
17 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
4,576
2018 count
Owner
State
State Highway Agency

About this bridge

SR 86 over Kellogg Creek is a prestressed concrete stringer/multi-beam or girder carrying SR 86 over Kellogg Creek in Lake County, Ohio. It was built in 2008, so it is 17 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,576 vehicles a day, roughly 4% of them trucks, projected to reach 6,351 by 2038. The structure is 100 ft (30.5 m) long and 47 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR 86
CrossesKellogg Creek
Location.63 MI S SR 84
RouteState Highway 86
StateOhio
Coordinates41.70531, -81.23167
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating89.9 US tons
Inventory rating65 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span100 ft (30.5 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,576 (2018)
Projected traffic6,351 by 2038
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 86 over Kellogg Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is SR 86 over Kellogg Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR 86 over Kellogg Creek carry?

About 4,576 vehicles per day (2018 count), of which roughly 4% are trucks.

How long is SR 86 over Kellogg Creek?

The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 47 ft wide.

Who owns SR 86 over Kellogg Creek?

It is owned by the State Highway Agency.