Usr 20 over Chagrin Riv 1.58 Miw 306
GoodLake County, Ohio · 1000 Ft E SR640 · Structure no. 4302095
- Built
- 1979
- 46 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 415 ft
- 4 main spans
- Daily traffic
- 15,508
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
Usr 20 over Chagrin Riv 1.58 Miw 306 is a prestressed concrete stringer/multi-beam or girder carrying Usr 20 over Chagrin Riv 1.58 Miw 306 in Lake County, Ohio. It was built in 1979, so it is 46 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 15,508 vehicles a day, roughly 6% of them trucks, projected to reach 21,525 by 2035. The structure is 415 ft (126.5 m) long and 70 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Usr 20 over Chagrin Riv 1.58 Miw 306 built?
It was built in 1979, making it 46 years old in 2025.
What condition is Usr 20 over Chagrin Riv 1.58 Miw 306 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Usr 20 over Chagrin Riv 1.58 Miw 306 carry?
About 15,508 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is Usr 20 over Chagrin Riv 1.58 Miw 306?
The structure is 415 ft (126.5 m) long with a longest span of 101 ft (30.8 m) and a deck 70 ft wide.
Who owns Usr 20 over Chagrin Riv 1.58 Miw 306?
It is owned by the State Highway Agency.