East High Street over Center Run
FairKnox County, Ohio · 0.2 MI West of Edgewood · Structure no. 4232690
- Built
- 1924
- 101 years old, rebuilt 1991
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 55 ft
- 1 main span
- Daily traffic
- 3,399
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
East High Street over Center Run is a prestressed concrete box beam or girders - multiple carrying East High Street over Center Run in Knox County, Ohio. It was built in 1924 and reconstructed in 1991, so it is 101 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,399 vehicles a day, roughly 5% of them trucks, projected to reach 4,600 by 2035. The structure is 55 ft (16.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was East High Street over Center Run built?
It was built in 1924, making it 101 years old in 2025. It was reconstructed in 1991.
What condition is East High Street over Center Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does East High Street over Center Run carry?
About 3,399 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is East High Street over Center Run?
The structure is 55 ft (16.8 m) long with a longest span of 53 ft (16.2 m) and a deck 40 ft wide.
Who owns East High Street over Center Run?
It is owned by the City or Municipal Highway Agency.