US Bridges

Usr 62 over Indianfield Run

Good

Knox County, Ohio · .2 M W of JCT SR 229 · Structure no. 4202082

Built
2009
16 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
50 ft
1 main span
Daily traffic
2,693
2015 count
Owner
State
State Highway Agency

About this bridge

Usr 62 over Indianfield Run is a prestressed concrete box beam or girders - multiple carrying Usr 62 over Indianfield Run in Knox County, Ohio. It was built in 2009, so it is 16 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,693 vehicles a day, roughly 19% of them trucks, projected to reach 3,738 by 2035. The structure is 50 ft (15.3 m) long and 40 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesUsr 62
CrossesIndianfield Run
Location.2 M W of JCT SR 229
RouteU.S. Route 62
StateOhio
Coordinates40.3434, -82.3014
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating59 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length50 ft (15.3 m)
Longest span49 ft (14.8 m)
Deck width40 ft (12.2 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,693 (2015)
Projected traffic3,738 by 2035
Trucks19%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Usr 62 over Indianfield Run built?

It was built in 2009, making it 16 years old in 2025.

What condition is Usr 62 over Indianfield Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Usr 62 over Indianfield Run carry?

About 2,693 vehicles per day (2015 count), of which roughly 19% are trucks.

How long is Usr 62 over Indianfield Run?

The structure is 50 ft (15.3 m) long with a longest span of 49 ft (14.8 m) and a deck 40 ft wide.

Who owns Usr 62 over Indianfield Run?

It is owned by the State Highway Agency.