US Bridges

SR 124 over Trib of Rich Run

Good

Jackson County, Ohio · .92 MI W of Vinton Line · Structure no. 4002378

Built
2019
6 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
22 ft
1 main span
Daily traffic
889
2017 count
Owner
State
State Highway Agency

About this bridge

SR 124 over Trib of Rich Run is a concrete culvert carrying SR 124 over Trib of Rich Run in Jackson County, Ohio. It was built in 2019, so it is 6 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 889 vehicles a day, roughly 17% of them trucks, projected to reach 1,437 by 2037. The structure is 22 ft (6.8 m) long. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSR 124
CrossesTrib of Rich Run
Location.92 MI W of Vinton Line
RouteState Highway 124
StateOhio
Coordinates39.09338, -82.44543
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert9 ExcellentNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating75 US tons
Inventory rating57.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length22 ft (6.8 m)
Longest span20 ft (6.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic889 (2017)
Projected traffic1,437 by 2037
Trucks17%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 124 over Trib of Rich Run built?

It was built in 2019, making it 6 years old in 2025.

What condition is SR 124 over Trib of Rich Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does SR 124 over Trib of Rich Run carry?

About 889 vehicles per day (2017 count), of which roughly 17% are trucks.

How long is SR 124 over Trib of Rich Run?

The structure is 22 ft (6.8 m) long with a longest span of 20 ft (6.2 m).

Who owns SR 124 over Trib of Rich Run?

It is owned by the State Highway Agency.