Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr
GoodHuron County, Ohio · 0.4 MI N of Baseline RD · Structure no. 3948412
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Multiple
- Concrete
- Length
- 37 ft
- 1 main span
- Daily traffic
- 72
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr is a concrete box beam or girders - multiple carrying Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr in Huron County, Ohio. It was built in 1976, so it is 49 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 72 vehicles a day, roughly 7% of them trucks, projected to reach 100 by 2035. The structure is 37 ft (11.3 m) long and 25 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr built?
It was built in 1976, making it 49 years old in 2025.
What condition is Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr carry?
About 72 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr?
The structure is 37 ft (11.3 m) long with a longest span of 35 ft (10.7 m) and a deck 25 ft wide.
Who owns Grnwch Milan Tl 51 over Grn MI T L/Sw Br Vrm Rvr?
It is owned by the County Highway Agency.