New London S L 21 over New London S L/ C D 1301
GoodHuron County, Ohio · 0.2 MI E of Chenango Road · Structure no. 3944174
- Built
- 1997
- 28 years old, rebuilt 2024
- Condition
- Good
- inspected September 2024
- Type
- Slab
- Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 393
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
New London S L 21 over New London S L/ C D 1301 is a concrete slab carrying New London S L 21 over New London S L/ C D 1301 in Huron County, Ohio. It was built in 1997 and reconstructed in 2024, so it is 28 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 393 vehicles a day, roughly 7% of them trucks, projected to reach 400 by 2035. The structure is 30 ft (9.1 m) long and 30 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was New London S L 21 over New London S L/ C D 1301 built?
It was built in 1997, making it 28 years old in 2025. It was reconstructed in 2024.
What condition is New London S L 21 over New London S L/ C D 1301 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does New London S L 21 over New London S L/ C D 1301 carry?
About 393 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is New London S L 21 over New London S L/ C D 1301?
The structure is 30 ft (9.1 m) long with a longest span of 27 ft (8.2 m) and a deck 30 ft wide.
Who owns New London S L 21 over New London S L/ C D 1301?
It is owned by the County Highway Agency.