Peru West Section over Stream
GoodHuron County, Ohio · Just East of Adams RD · Structure no. 3935566
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected November 2024
- Type
- Frame
- Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 324
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Peru West Section over Stream is a concrete frame carrying Peru West Section over Stream in Huron County, Ohio. It was built in 2011, so it is 14 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 324 vehicles a day, roughly 7% of them trucks, projected to reach 450 by 2035. The structure is 24 ft (7.3 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Peru West Section over Stream built?
It was built in 2011, making it 14 years old in 2025.
What condition is Peru West Section over Stream in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Peru West Section over Stream carry?
About 324 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Peru West Section over Stream?
The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Peru West Section over Stream?
It is owned by the County Highway Agency.