Greenwich Milan Tl over Grnwch MI T L/Norwalk CR
GoodHuron County, Ohio · 0.1 MI S of SR 18 · Structure no. 3933172
- Built
- 2004
- 21 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 979
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Greenwich Milan Tl over Grnwch MI T L/Norwalk CR is a prestressed concrete box beam or girders - multiple carrying Greenwich Milan Tl over Grnwch MI T L/Norwalk CR in Huron County, Ohio. It was built in 2004, so it is 21 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 979 vehicles a day, roughly 7% of them trucks, projected to reach 1,359 by 2035. The structure is 44 ft (13.4 m) long and 32 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenwich Milan Tl over Grnwch MI T L/Norwalk CR built?
It was built in 2004, making it 21 years old in 2025.
What condition is Greenwich Milan Tl over Grnwch MI T L/Norwalk CR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Greenwich Milan Tl over Grnwch MI T L/Norwalk CR carry?
About 979 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Greenwich Milan Tl over Grnwch MI T L/Norwalk CR?
The structure is 44 ft (13.4 m) long with a longest span of 41 ft (12.5 m) and a deck 32 ft wide.
Who owns Greenwich Milan Tl over Grnwch MI T L/Norwalk CR?
It is owned by the County Highway Agency.