SR 61C Spur over East Br of Huron River
GoodHuron County, Ohio · .60 Miles East of SR20 · Structure no. 3902250
- Built
- 1940
- 85 years old, rebuilt 1992
- Condition
- Good
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 79 ft
- 1 main span
- Daily traffic
- 4,300
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 61C Spur over East Br of Huron River is a steel stringer/multi-beam or girder carrying SR 61C Spur over East Br of Huron River in Huron County, Ohio. It was built in 1940 and reconstructed in 1992, so it is 85 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,300 vehicles a day, roughly 8% of them trucks, projected to reach 5,968 by 2035. The structure is 79 ft (24.1 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 61C Spur over East Br of Huron River built?
It was built in 1940, making it 85 years old in 2025. It was reconstructed in 1992.
What condition is SR 61C Spur over East Br of Huron River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does SR 61C Spur over East Br of Huron River carry?
About 4,300 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is SR 61C Spur over East Br of Huron River?
The structure is 79 ft (24.1 m) long with a longest span of 73 ft (22.3 m) and a deck 64 ft wide.
Who owns SR 61C Spur over East Br of Huron River?
It is owned by the State Highway Agency.