US Bridges

Township Road 180 over South Fork Sugar Creek

Good

Holmes County, Ohio · 0.34 Miles North of SR 64 · Structure no. 3830000

Built
2014
11 years old
Condition
Good
inspected December 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
29 ft
1 main span
Daily traffic
96
2015 count
Owner
County
County Highway Agency

About this bridge

Township Road 180 over South Fork Sugar Creek is a concrete box beam or girders - multiple carrying Township Road 180 over South Fork Sugar Creek in Holmes County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 96 vehicles a day, roughly 7% of them trucks, projected to reach 133 by 2035. The structure is 29 ft (8.8 m) long and 18 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTownship Road 180
CrossesSouth Fork Sugar Creek
Location0.34 Miles North of SR 64
RouteCounty Highway T0180
StateOhio
Coordinates40.46756, -81.74003
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionDecember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating74.3 US tons
Inventory rating44.6 US tons

Structure

MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length29 ft (8.8 m)
Longest span27 ft (8.1 m)
Deck width18 ft (5.6 m)
Roadway width18 ft (5.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic96 (2015)
Projected traffic133 by 2035
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Township Road 180 over South Fork Sugar Creek built?

It was built in 2014, making it 11 years old in 2025.

What condition is Township Road 180 over South Fork Sugar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Township Road 180 over South Fork Sugar Creek carry?

About 96 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Township Road 180 over South Fork Sugar Creek?

The structure is 29 ft (8.8 m) long with a longest span of 27 ft (8.1 m) and a deck 18 ft wide.

Who owns Township Road 180 over South Fork Sugar Creek?

It is owned by the County Highway Agency.