US Bridges

SR 83 over Trail Bike/Buggy Path

Good

Holmes County, Ohio · SR 00083 · Structure no. 3801861

Built
2006
19 years old
Condition
Good
inspected July 2024
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
6,022
2015 count
Owner
State
State Highway Agency

About this bridge

SR 83 over Trail Bike/Buggy Path is a concrete culvert carrying SR 83 over Trail Bike/Buggy Path in Holmes County, Ohio. It was built in 2006, so it is 19 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,022 vehicles a day, roughly 8% of them trucks, projected to reach 8,359 by 2035. The structure is 26 ft (7.8 m) long. If it were closed, the detour would be 19.3 mi (31 km).

CarriesSR 83
CrossesTrail Bike/Buggy Path
LocationSR 00083
RouteState Highway 83
StateOhio
Coordinates40.61987, -81.91954
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length26 ft (7.8 m)
Longest span26 ft (7.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,022 (2015)
Projected traffic8,359 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed19.3 mi (31 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 83 over Trail Bike/Buggy Path built?

It was built in 2006, making it 19 years old in 2025.

What condition is SR 83 over Trail Bike/Buggy Path in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does SR 83 over Trail Bike/Buggy Path carry?

About 6,022 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SR 83 over Trail Bike/Buggy Path?

The structure is 26 ft (7.8 m) long with a longest span of 26 ft (7.8 m).

Who owns SR 83 over Trail Bike/Buggy Path?

It is owned by the State Highway Agency.