S.R.83 over Colliers Run
GoodHolmes County, Ohio · 2.92 MI N of JCT US 62 · Structure no. 3801772
- Built
- 1973
- 52 years old, rebuilt 2024
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 6,022
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
S.R.83 over Colliers Run is a prestressed concrete box beam or girders - multiple carrying S.R.83 over Colliers Run in Holmes County, Ohio. It was built in 1973 and reconstructed in 2024, so it is 52 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,022 vehicles a day, roughly 8% of them trucks, projected to reach 8,359 by 2035. The structure is 39 ft (11.9 m) long and 32 ft wide. If it were closed, the detour would be 42.9 mi (69 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S.R.83 over Colliers Run built?
It was built in 1973, making it 52 years old in 2025. It was reconstructed in 2024.
What condition is S.R.83 over Colliers Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does S.R.83 over Colliers Run carry?
About 6,022 vehicles per day (2015 count), of which roughly 8% are trucks.
How long is S.R.83 over Colliers Run?
The structure is 39 ft (11.9 m) long with a longest span of 36 ft (11 m) and a deck 32 ft wide.
Who owns S.R.83 over Colliers Run?
It is owned by the State Highway Agency.