SR 3 over Plum Run
GoodHolmes County, Ohio · 2.98 MI S of SR 179 · Structure no. 3800075
- Built
- 1991
- 34 years old
- Condition
- Good
- inspected July 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 69 ft
- 1 main span
- Daily traffic
- 2,639
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
SR 3 over Plum Run is a prestressed concrete box beam or girders - multiple carrying SR 3 over Plum Run in Holmes County, Ohio. It was built in 1991, so it is 34 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,639 vehicles a day, roughly 9% of them trucks, projected to reach 3,663 by 2035. The structure is 69 ft (21 m) long and 69 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 3 over Plum Run built?
It was built in 1991, making it 34 years old in 2025.
What condition is SR 3 over Plum Run in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does SR 3 over Plum Run carry?
About 2,639 vehicles per day (2015 count), of which roughly 9% are trucks.
How long is SR 3 over Plum Run?
The structure is 69 ft (21 m) long with a longest span of 65 ft (19.8 m) and a deck 69 ft wide.
Who owns SR 3 over Plum Run?
It is owned by the State Highway Agency.