US Bridges

SR 753 over Duncan Run

Good

Highland County, Ohio · 1.01 MI S of SR 138 · Structure no. 3604365

Built
1997
28 years old
Condition
Good
inspected May 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
36 ft
1 main span
Daily traffic
2,057
2015 count
Owner
State
State Highway Agency

About this bridge

SR 753 over Duncan Run is a prestressed concrete box beam or girders - multiple carrying SR 753 over Duncan Run in Highland County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,057 vehicles a day, roughly 8% of them trucks, projected to reach 2,855 by 2035. The structure is 36 ft (10.9 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSR 753
CrossesDuncan Run
Location1.01 MI S of SR 138
RouteState Highway 753
StateOhio
Coordinates39.3324, -83.39808
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating71.1 US tons
Inventory rating53.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length36 ft (10.9 m)
Longest span34 ft (10.5 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,057 (2015)
Projected traffic2,855 by 2035
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 753 over Duncan Run built?

It was built in 1997, making it 28 years old in 2025.

What condition is SR 753 over Duncan Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does SR 753 over Duncan Run carry?

About 2,057 vehicles per day (2015 count), of which roughly 8% are trucks.

How long is SR 753 over Duncan Run?

The structure is 36 ft (10.9 m) long with a longest span of 34 ft (10.5 m) and a deck 32 ft wide.

Who owns SR 753 over Duncan Run?

It is owned by the State Highway Agency.