Stevenson Street over Oberhaus Creek
GoodHenry County, Ohio · 0.1 MI N of Carey St. · Structure no. 3560024
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 41 ft
- 1 main span
- Daily traffic
- 340
- 2016 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Stevenson Street over Oberhaus Creek is a prestressed concrete box beam or girders - multiple carrying Stevenson Street over Oberhaus Creek in Henry County, Ohio. It was built in 2017, so it is 8 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 340 vehicles a day, roughly 5% of them trucks, projected to reach 472 by 2036. The structure is 41 ft (12.5 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stevenson Street over Oberhaus Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is Stevenson Street over Oberhaus Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Stevenson Street over Oberhaus Creek carry?
About 340 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Stevenson Street over Oberhaus Creek?
The structure is 41 ft (12.5 m) long with a longest span of 37 ft (11.3 m) and a deck 36 ft wide.
Who owns Stevenson Street over Oberhaus Creek?
It is owned by the City or Municipal Highway Agency.