US Bridges

Twp. Rd. P3 over S Turkey Foot Creek 900

FairPosted for load

Henry County, Ohio · 0.28 Mi. East of Rd. 6B · Structure no. 3531473

Built
1949
76 years old
Condition
Fair
inspected November 2024
Type
Slab
Concrete Continuous
Length
109 ft
3 main spans
Daily traffic
351
2015 count
Owner
County
County Highway Agency

About this bridge

Twp. Rd. P3 over S Turkey Foot Creek 900 is a concrete continuous slab carrying Twp. Rd. P3 over S Turkey Foot Creek 900 in Henry County, Ohio. It was built in 1949, so it is 76 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 351 vehicles a day, roughly 7% of them trucks, projected to reach 487 by 2035. The structure is 109 ft (33.2 m) long and 21 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesTwp. Rd. P3
CrossesS Turkey Foot Creek 900
Location0.28 Mi. East of Rd. 6B
RouteCounty Highway T00P3
StateOhio
Coordinates41.39306, -83.98
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 12 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating25 US tons
Inventory rating14.3 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length109 ft (33.2 m)
Longest span40 ft (12.2 m)
Deck width21 ft (6.4 m)
Roadway width21 ft (6.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic351 (2015)
Projected traffic487 by 2035
Trucks7%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Twp. Rd. P3 over S Turkey Foot Creek 900 built?

It was built in 1949, making it 76 years old in 2025.

What condition is Twp. Rd. P3 over S Turkey Foot Creek 900 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Twp. Rd. P3 over S Turkey Foot Creek 900 carry?

About 351 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Twp. Rd. P3 over S Turkey Foot Creek 900?

The structure is 109 ft (33.2 m) long with a longest span of 40 ft (12.2 m) and a deck 21 ft wide.

Who owns Twp. Rd. P3 over S Turkey Foot Creek 900?

It is owned by the County Highway Agency.