Twp. Rd. H over Ditch 1281-2 Hammer Cree
GoodHenry County, Ohio · 0.4 Mi. East of Rd. 2 · Structure no. 3530884
- Built
- 1985
- 40 years old
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 67 ft
- 1 main span
- Daily traffic
- 46
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Twp. Rd. H over Ditch 1281-2 Hammer Cree is a prestressed concrete box beam or girders - multiple carrying Twp. Rd. H over Ditch 1281-2 Hammer Cree in Henry County, Ohio. It was built in 1985, so it is 40 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 46 vehicles a day, roughly 7% of them trucks, projected to reach 64 by 2035. The structure is 67 ft (20.4 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Twp. Rd. H over Ditch 1281-2 Hammer Cree built?
It was built in 1985, making it 40 years old in 2025.
What condition is Twp. Rd. H over Ditch 1281-2 Hammer Cree in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Twp. Rd. H over Ditch 1281-2 Hammer Cree carry?
About 46 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Twp. Rd. H over Ditch 1281-2 Hammer Cree?
The structure is 67 ft (20.4 m) long with a longest span of 65 ft (19.8 m) and a deck 28 ft wide.
Who owns Twp. Rd. H over Ditch 1281-2 Hammer Cree?
It is owned by the County Highway Agency.