Twp. Rd. 3 over Ditch 1559-3
FairPosted for loadHenry County, Ohio · 0.15 Mi. South of Rd. C · Structure no. 3530175
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 73
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Twp. Rd. 3 over Ditch 1559-3 is a steel stringer/multi-beam or girder carrying Twp. Rd. 3 over Ditch 1559-3 in Henry County, Ohio. It was built in 1958, so it is 67 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 73 vehicles a day, roughly 7% of them trucks, projected to reach 101 by 2035. The structure is 43 ft (13.1 m) long and 24 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Twp. Rd. 3 over Ditch 1559-3 built?
It was built in 1958, making it 67 years old in 2025.
What condition is Twp. Rd. 3 over Ditch 1559-3 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Twp. Rd. 3 over Ditch 1559-3 carry?
About 73 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Twp. Rd. 3 over Ditch 1559-3?
The structure is 43 ft (13.1 m) long with a longest span of 39 ft (11.9 m) and a deck 24 ft wide.
Who owns Twp. Rd. 3 over Ditch 1559-3?
It is owned by the County Highway Agency.