Independence Ave over Tobias Martin Jt CO Dit
GoodHancock County, Ohio · 0.34 MI S SR 12 · Structure no. 3260828
- Built
- 2000
- 25 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 926
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Independence Ave over Tobias Martin Jt CO Dit is a prestressed concrete box beam or girders - multiple carrying Independence Ave over Tobias Martin Jt CO Dit in Hancock County, Ohio. It was built in 2000, so it is 25 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 926 vehicles a day, roughly 9% of them trucks, projected to reach 1,285 by 2037. The structure is 52 ft (15.9 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Independence Ave over Tobias Martin Jt CO Dit built?
It was built in 2000, making it 25 years old in 2025.
What condition is Independence Ave over Tobias Martin Jt CO Dit in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Independence Ave over Tobias Martin Jt CO Dit carry?
About 926 vehicles per day (2017 count), of which roughly 9% are trucks.
How long is Independence Ave over Tobias Martin Jt CO Dit?
The structure is 52 ft (15.9 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.
Who owns Independence Ave over Tobias Martin Jt CO Dit?
It is owned by the County Highway Agency.