Mar Twp RD 205 over Corbin Ditch
GoodHancock County, Ohio · 0.40 MI E TR 240 · Structure no. 3230334
- Built
- 1969
- 56 years old, rebuilt 2022
- Condition
- Good
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 398
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Mar Twp RD 205 over Corbin Ditch is a prestressed concrete box beam or girders - multiple carrying Mar Twp RD 205 over Corbin Ditch in Hancock County, Ohio. It was built in 1969 and reconstructed in 2022, so it is 56 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 398 vehicles a day, roughly 16% of them trucks, projected to reach 601 by 2041. The structure is 62 ft (18.8 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mar Twp RD 205 over Corbin Ditch built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2022.
What condition is Mar Twp RD 205 over Corbin Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Mar Twp RD 205 over Corbin Ditch carry?
About 398 vehicles per day (2021 count), of which roughly 16% are trucks.
How long is Mar Twp RD 205 over Corbin Ditch?
The structure is 62 ft (18.8 m) long with a longest span of 59 ft (17.9 m) and a deck 26 ft wide.
Who owns Mar Twp RD 205 over Corbin Ditch?
It is owned by the County Highway Agency.