US Bridges

Ir 75 over NS RR

Good

Hancock County, Ohio · .54 Mi. S of SR 12 · Structure no. 3202976

Built
2019
6 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
266 ft
3 main spans
Daily traffic
24,378
2016 count
Owner
State
State Highway Agency

About this bridge

Ir 75 over NS RR is a prestressed concrete continuous stringer/multi-beam or girder carrying Ir 75 over NS RR in Hancock County, Ohio. It was built in 2019, so it is 6 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,378 vehicles a day, roughly 35% of them trucks, projected to reach 27,669 by 2036. The structure is 266 ft (81 m) long and 89 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesIr 75
CrossesNS RR
Location.54 Mi. S of SR 12
RouteInterstate 75
StateOhio
Coordinates41.02876, -83.67277
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.8 US tons
Inventory rating67.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length266 ft (81 m)
Longest span129 ft (39.3 m)
Deck width89 ft (27.1 m)
Roadway width86 ft (26.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,378 (2016)
Projected traffic27,669 by 2036
Trucks35%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ir 75 over NS RR built?

It was built in 2019, making it 6 years old in 2025.

What condition is Ir 75 over NS RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Ir 75 over NS RR carry?

About 24,378 vehicles per day (2016 count), of which roughly 35% are trucks.

How long is Ir 75 over NS RR?

The structure is 266 ft (81 m) long with a longest span of 129 ft (39.3 m) and a deck 89 ft wide.

Who owns Ir 75 over NS RR?

It is owned by the State Highway Agency.