Hamilton County, Ohio · 0.4 MI W of Dalton Ave · Structure no. 3161749

Built
1997
28 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
101 ft
1 main span
Daily traffic
1,000
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Gest Street over Mill Creek is a prestressed concrete box beam or girders - multiple carrying Gest Street over Mill Creek in Hamilton County, Ohio. It was built in 1997, so it is 28 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 1,388 by 2040. The structure is 101 ft (30.8 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGest Street
CrossesMill Creek
Location0.4 MI W of Dalton Ave
RouteCity Street 0GEST
StateOhio
Coordinates39.1074, -84.54465
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating107.1 US tons
Inventory rating34.6 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length101 ft (30.8 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2020)
Projected traffic1,388 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gest Street over Mill Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is Gest Street over Mill Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Gest Street over Mill Creek carry?

About 1,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Gest Street over Mill Creek?

The structure is 101 ft (30.8 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns Gest Street over Mill Creek?

It is owned by the City or Municipal Highway Agency.