US Bridges

Second Street over Parking Lot

Good

Hamilton County, Ohio · E Side Clay Wade Bailey · Structure no. 3160661

Built
2001
24 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
462 ft
4 main spans
Daily traffic
40,364
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Second Street over Parking Lot is a prestressed concrete continuous stringer/multi-beam or girder carrying Second Street over Parking Lot in Hamilton County, Ohio. It was built in 2001, so it is 24 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40,364 vehicles a day, roughly 7% of them trucks, projected to reach 56,025 by 2035. The structure is 462 ft (140.7 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSecond Street
CrossesParking Lot
LocationE Side Clay Wade Bailey
RouteCity Street 8654
StateOhio
Coordinates39.09605, -84.52101
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating28.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4 (+4 approach)
Design loadHS 20 + Mod
Structure length462 ft (140.7 m)
Longest span91 ft (27.7 m)
Deck width49 ft (14.9 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40,364 (2015)
Projected traffic56,025 by 2035
Trucks7%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Second Street over Parking Lot built?

It was built in 2001, making it 24 years old in 2025.

What condition is Second Street over Parking Lot in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Second Street over Parking Lot carry?

About 40,364 vehicles per day (2015 count), of which roughly 7% are trucks.

How long is Second Street over Parking Lot?

The structure is 462 ft (140.7 m) long with a longest span of 91 ft (27.7 m) and a deck 49 ft wide.

Who owns Second Street over Parking Lot?

It is owned by the City or Municipal Highway Agency.