US Bridges

Van Hart Street over Lick Run

Good

Hamilton County, Ohio · N of Westwood Ave. · Structure no. 3160005

Built
2018
7 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
530
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Van Hart Street over Lick Run is a prestressed concrete box beam or girders - multiple carrying Van Hart Street over Lick Run in Hamilton County, Ohio. It was built in 2018, so it is 7 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 530 vehicles a day, roughly 5% of them trucks, projected to reach 6,009 by 2038. The structure is 42 ft (12.8 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesVan Hart Street
CrossesLick Run
LocationN of Westwood Ave.
RouteCity Street 2955
StateOhio
Coordinates39.12546, -84.55899
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87.9 US tons
Inventory rating67.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length42 ft (12.8 m)
Longest span38 ft (11.6 m)
Deck width46 ft (14.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic530 (2018)
Projected traffic6,009 by 2038
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Van Hart Street over Lick Run built?

It was built in 2018, making it 7 years old in 2025.

What condition is Van Hart Street over Lick Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Van Hart Street over Lick Run carry?

About 530 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Van Hart Street over Lick Run?

The structure is 42 ft (12.8 m) long with a longest span of 38 ft (11.6 m) and a deck 46 ft wide.

Who owns Van Hart Street over Lick Run?

It is owned by the City or Municipal Highway Agency.