US Bridges

WB Ir 275 over CR 354(BIRNEY Lane)

Fair

Hamilton County, Ohio · .4 MI W of US 52 · Structure no. 3116972

Built
1973
52 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
246 ft
3 main spans
Daily traffic
16,569
2015 count
Owner
State
State Highway Agency

About this bridge

WB Ir 275 over CR 354(BIRNEY Lane) is a steel continuous stringer/multi-beam or girder carrying WB Ir 275 over CR 354(BIRNEY Lane) in Hamilton County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,569 vehicles a day, roughly 6% of them trucks, projected to reach 22,998 by 2035. The structure is 246 ft (75 m) long and 45 ft wide.

CarriesWB Ir 275
CrossesCR 354(BIRNEY Lane)
Location.4 MI W of US 52
RouteInterstate 275
StateOhio
Coordinates39.05796, -84.38371
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry7: Better than present minimum criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length246 ft (75 m)
Longest span92 ft (28 m)
Deck width45 ft (13.7 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,569 (2015)
Projected traffic22,998 by 2035
Trucks6%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB Ir 275 over CR 354(BIRNEY Lane) built?

It was built in 1973, making it 52 years old in 2025.

What condition is WB Ir 275 over CR 354(BIRNEY Lane) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does WB Ir 275 over CR 354(BIRNEY Lane) carry?

About 16,569 vehicles per day (2015 count), of which roughly 6% are trucks.

How long is WB Ir 275 over CR 354(BIRNEY Lane)?

The structure is 246 ft (75 m) long with a longest span of 92 ft (28 m) and a deck 45 ft wide.

Who owns WB Ir 275 over CR 354(BIRNEY Lane)?

It is owned by the State Highway Agency.