WB Ir 275 over CR 354(BIRNEY Lane)
FairHamilton County, Ohio · .4 MI W of US 52 · Structure no. 3116972
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 246 ft
- 3 main spans
- Daily traffic
- 16,569
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
WB Ir 275 over CR 354(BIRNEY Lane) is a steel continuous stringer/multi-beam or girder carrying WB Ir 275 over CR 354(BIRNEY Lane) in Hamilton County, Ohio. It was built in 1973, so it is 52 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,569 vehicles a day, roughly 6% of them trucks, projected to reach 22,998 by 2035. The structure is 246 ft (75 m) long and 45 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB Ir 275 over CR 354(BIRNEY Lane) built?
It was built in 1973, making it 52 years old in 2025.
What condition is WB Ir 275 over CR 354(BIRNEY Lane) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does WB Ir 275 over CR 354(BIRNEY Lane) carry?
About 16,569 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is WB Ir 275 over CR 354(BIRNEY Lane)?
The structure is 246 ft (75 m) long with a longest span of 92 ft (28 m) and a deck 45 ft wide.
Who owns WB Ir 275 over CR 354(BIRNEY Lane)?
It is owned by the State Highway Agency.